Home arrow Documents arrow FCA Handbook arrow Appendix A - Schedule of Commercial and Domestic Fixing Rates
Newsflash
Member contact details amended and new information links added.
Appendix A - Schedule of Commercial and Domestic Fixing Rates Print E-mail
Written by Administrator   
Friday, 09 September 2005

Schedule of Commercial Fixing Rates

  17/7/97
$
01/10/97
+9%
01/08/98
+3%
01/02/99
+3%
Daily minimum charge 94.69 103.21 106.31 109.50
Hourly rate 26.64 29.04 29.91 30.81
Vinyl tyles - 20-49 m2
50-99 m2
100-249 m2
250-499 m2
500 m2 and over
4.54
3.62
2.72
1.96
1.64
4.95
3.95
2.96
3.05
3.15
5.10
4.06
3.05
2.20
1.84
5.25
4.19
3.15
2.27
1.90
Sheeting vinyl (including welding) - 20-49 m2
50-249 m2
250-499 m2
500 m2 and over
5.14
3.52
3.14
2.72
5.60
3.84
3.42
2.96
5.77
3.95
3.53
3.05
5.94
4.07
3.63
3.15
For Altro, Corlon and Lino m2 - additional 1.13 1.23 1.27 1.31
Hardboard Underlay (including supply of
staples by subcontractor) 20-49 m2
50-249 m2
250-499 m2
500 m2 and over

4.85
3.05
2.58
2.39

5.29
3.32
2.81
2.61

5.45
3.42
2.90
2.68

5.94
3.53
2.99
2.76
Restaple hardboard m2 1.40 1.53 1.57 1.62
Hardboard on pineboard m2(additional) 0.50 0.55 0.56 0.58
Day tiles - vinyl tile rates plus 50% - - - -
Day tiles - Boarders and squares - day tile rate + 50% - - - -
Cork tiles - laying out m2 6.10 6.65 6.85 7.05
PVC Nosing m2 3.08 3.36 3.46 3.56
Aluminium nosing to timber - lm 4.03 4.39 4.52 4.66
Aluminium nosing to concrete - lm 6.48 7.06 7.28 7.49
Stair treads - lm 3.33 3.63 3.74 3.85
Stair risers - lm 3.33 3.63 3.74 3.85
Treads and riser coved - lm 6.10 6.65 6.85 7.05
Ripple trim to timber - lm 2.04 2.22 2.29 2.36
Ripple trim to concrete - lm 3.59 3.91 4.03 4.15
100mm skirting - lm 1.63 1.78 1.83 1.88
150mm skirting - lm 2.04 2.22 2.29 2.36
100mm flat skirting over carpet or smooth edge - lm 2.13 2.32 2.39 2.46
150mm flat skirting over carpet or smooth edge - lm 2.39 2.61 2.68 2.76
Reducing strip and capping - lm 1.84 2.01 2.07 3.13
Preform cove - lm 1.41 1.54 1.58 1.63
stringer to walls - lm 3.21 3.50 3.60 3.71
stringer to stairs - lm 8.05 8.77 9.04 9.31
Ardit (skim) per coat m2 1.53 1.67 1.72 1.77
K10 and K15 m2 1.84 2.01 2.07 2.13
Grinding concrete - hourly rate - - - -
PVA underlay (primer included in PVA) m2 9.04 9.85 10.15 10.45
Cement based primer m2 1.51 1.65 1.70 1.75
Acid etch etc. hourly rate - - - -
Fill expansion joints - hourly rate - - - -
Raking - cutting - including in vinyl rate - - - -
Cove sheet vinyl (up to 100mm high) - lm 3.59 3.91 4.03 4.15
Cove sheet vinyl (up to 100mm high) - lm 0.46 0.50 0.52 0.53
Cove tiles - lm 7.02 7.65 7.88 8.12
Rubber tiles - lm 7.02 7.65 7.88 8.12
Sheet vinyl to walls including welding m2
(see conditions re extra charge for scaffolding)

9.04

9.85

10.15

10.45
Bulletin board m2 12.07 13.16 13.55 13.96
Take up loose lay m2
(see conditions re removal of rubbish)
1.20 1.31 1.35 1.39
Take up stuck m2 3.70 4.03 4.15 4.28
Take up PVA m2 6.10 6.65 6.85 7.05
Take up hardboard and coverings including
removal of staples m2

3.85

4.20

4.32

4.45
Take up stair tread nosing (PVC) - lm 0.98 1.07 1.10 1.13
Take up stair tread nosing aluminium 3.70 4.03 4.15 4.28
Bar tops m 29.29 31.93 32.88 33.87
Travel time outside metropolitan area p.h. 22.61 24.64 25.38 26.15
Travel per kilometre return 0.64 0.70 0.72 0.74
Accommodation per day 70.67 77.03 79.34 81.72
Move furniture hourly rate 22.64 29.04 29.91 30.81

Schedule Of Domestic Fixing Rates


Minimum charge
17/7/97
$
01/10/97
+9%
01/08/98
+3%
01/02/99
+3%
183cm * 2m vinyls (exept inlaid) - 1m 13.11 14.29 14.72 15.16
183cm inlaid vinyl (if layer supplies template paper) - 1m 16.14 17.59 18.12 18.66
274cm vinyl - 1m 18.19 19.83 20.42 21.03
366cm * 4m vinyl - 1m 21.72 23.67 24.39 25.12
Daytime with border and squars m2 9.80 10.68 11.00 11.33
Vinyl tiles m2 7.60 8.28 8.53 8.79
Hardboard m2 5.44 5.93 6.11 6.29
K10 and Ardit (labour only) m2 2.04 2.22 2.29 2.36
PVA (labour only) m2 8.05 8.77 9.04 9.31
Additional rate for stairs in addition to rate
per metre - per stair

3.59

3.91

4.03

4.15
Cove skirting - 1m 3.22 3.51 3.62 3.72
Perform fillet - 1m 2.04 2.22 2.29 2.36
Take ups:
Loose laid material per room

15.12

16.48

16.98

17.48
Stuck down including hardboard m 7.60 8.28 8.53 8.79
Direct to subfloor m2 10.09 11.00 11.33 11.67
Electrical applicances, removal and replace - per appliance 5.02 5.47 5.64 5.81
Minimum charges (labour only) PVA:        
Laundry 94.69 103.21 106.31 109.50
Bath room 94.69 103.21 106.31 109.50
Other areas (of total job etc) 54.11 58.98 60.75 62.57
Ardit Z8 54.11 58.98 60.75 62.57
Mastick K10 54.11 58.98 60.75 62.57
Accessories, trim etc:        
small - 1m 2.20 2.40 2.47 2.54
Large - 1m 2.20 2.40 2.40 2.40
To supply adhesive m2 0.70 0.76 0.79 0.81
Cancellation charge: travel time to & from
employees site @ hourly rate
- - - -
Service charge: If layer has to return
to site to carry out rectification not own fault - hourly
rate plus the service charge shown

31.01

33.80

34.81

35.86
Last Updated ( Friday, 09 September 2005 )
< Prev   Next >
www.mozilla.org www.microshare.com.au www.mamboserver.com